Murzuq Basin & Kufra Basin
Repsol YPF (REMSA)
Civil Engineering Works and Land Transportation
| Basin | Concession | Locations | Date |
|---|---|---|---|
| Murzuq | NC 186 | 3 | 2003–2004 |
| Murzuq | NC 200 | 4 | 2004–2005 |
| Murzuq | NC 190 | 3 | 2005 |
| Murzuq | NC 187 | 2 | 2006 |
| Murzuq | NC 190 | 3 | 2006 |
| Murzuq | NC 200 | 4 | 2006–2007 |
| Murzuq | NC 200 | 4 | 2008 |
| Kufra | NC 203 | 2 | 2008 |
Since 2003, FIGOS has been responsible for all transportation of drilling materials and tubulars from NC 115 CCX, Elsharara Field, to different concessions, as well as transportation of the same materials between locations within one concession.

