FIGOS have tremendous capacity to efficiently run multiple sites at a time. Our roboust fleet of transport systems and other vehicles for oilfield support are unmatched. Above all we also have rescue and medical aid vans that work as crucial support line for any operations.
- Repsol YPF (REMSA) – Murzuq Basin & Kufra Basin “Civil Engineering Works and Land Transportation"
- Shell Exploration & Production – Libya (SEPLG) “Land Transportation”
- Woodside (N.A) Ltd. – Sirte Basin “Civil Engineering Works”
- KCA Deutag Drilling GmbH “Transportation & Rig Mobilization”
- Additional site the company been working on
Repsol YPF (REMSA) – Murzuq Basin & Kufra Basin “Civil Engineering Works and Land Transportation"
Basin | Concession | Number of Locations | Date |
Murzuq Basin | NC 186 | 3 | 2003-2004 |
Murzuq Basin | NC 200 | 4 | 2004-2005 |
Murzuq Basin | NC 190 | 3 | 2005 |
Murzuq Basin | NC 187 | 2 | 2006 |
Murzuq Basin | NC 190 | 3 | 2006 |
Murzuq Basin | NC 200 | 4 | 2006-2007 |
Murzuq Basin | NC 200 | 4 | 2008 |
Kufra | NC 203 | 2 | 2008 |
Notes: Since 2003 up to date FIGOS responsible for all transportation of drilling materials and tubular from NC 115 CCX ― Elshararah Field to different concessions as well as transportation of these same materials within locations inside one concession.
Shell Exploration & Production – Libya (SEPLG) “Land Transportation”
From | To | Date |
Tripoli | Marsa EL Brega | 2007 - 2009 |
Misurata | Marsa EL Brega | 2007 – 2009 |
Marsa EL Brega | NC 214 | 2007 – 2009 |
Benghazi | NC 214 | 2007 - 2009 |
Note: FIGOS since the end of 2007 has been carrying out all land transport for SEPLG (Shell Royal Dutch) and SEPLG’s Contractors.
Woodside (N.A) Ltd. – Sirte Basin “Civil Engineering Works”
Basin | Concession | Number of Locations | Date |
Sirte | NC 209 | 1 | 2007 |
Sirte | NC 208 | 1 | 2008 |
Sirte | NC 206 | 3 | 2008 |
Sirte | NC 205 | 2 | 2008 |
Note: Woodside awarded contract No. S3005 to FIGOS in order to carry out only civil work in Sirte Basin but according to our good performance ―compliance to Woodside standards in earth moving & HSE requirements‖ Woodside decided to request FIGOS to carry out civil works in Murzuq Basin as well.
KCA Deutag Drilling GmbH “Transportation & Rig Mobilization”
Rig Name | From | To | Date |
T – 108 | NC 190 | NC 200 | 2006 |
T – 108 | NC 186 | NC 200 | 2007 |
ILI 206 | NC 200 | NC 203 | 2008-2009 |
T - 202 | Tripoli | NC 214 | 2007 |
T - 202 | Raslanof | NC 2104 | 2008 |
T – 19 | NC 198 | NC 195 RWE | 2007 |
T - 19 | NC 47 | NC 47 | 2007-2008 |
ILI 32 | NC47 | NC 47 | 2007-2008 |
Note: Rig T – 202 ―the biggest drilling rig in North Africa‖ now drilling for Shell in NC 214. FIGOS was chosen to carry out the much exposure task which ever experienced before but according to FIGOS’s competent staff, FIGOS succeeded to carry out this mission in a professional manner
During 2008 FIGOS is responsible for Rig ILI 32 & T-19 mobilization within NC 47 from the beginning of the year till now.
Additional site the company been working on
Basin | Concession |
Sharara field /ubari | NC 115 |
Jalu basin | 59 |
Jalu company site | 103 |